All Galleries › Director's Choice › Calypso Bay
OSA Galleries › Director's Choice Calypso BayClick/tap on an image to view the full-sized image(s)  | ||||
Calypso Bay Project view early  | 
North view under construction  | 
South view under construction  | 
South view under construction  | 
Laying decking  | 
Second level Bearer to post connection  | 
Second level Bearer to post connection  | 
Bearer to post - closeup  | 
Second level handrail posts  | 
Second level handrail posts  | 
Calypso Bay Post Top  | 
Second level almost complete  | 
Calypso Bay step support  | 
Calypso Bay Step building  | 
Completed decking  | 
Completed decking  | 
Completed project  | 
|||
Click/tap on an image to view the full-sized image(s)  | ||||
| Calypso Bay Project details | |
|---|---|
| 
 Calypso Bay is a marina and associated development at Jacobs Well between the Gold Coast and Brisbane. The boardwalk is 450m long and 7.2m wide (on 2 levels) and is built on Koppers marine piles. The Deck utilises 120×35 pre-oiled Deckwood® and 150×75 Joistwood. The bearers over the piles are 300×200 spotted gum so allowing a row of piles to be deleted. Handrail posts are 300×300 spotted gum. This has been our largest project to date. This is arguably the largest deck in eastern Australia!  | |
| Boardwalk systems: | Outdoor Structures Australia | 
| Construction: | Contrast Constructions | 
| Master Planners: | ML Design | 
| Engineering: | Cardno | 
| Owner: | Roche Group | 
| Project management: | Reddy Constructions Pty Ltd | 
| 
 Read Tanalife article (465KB PDF)  | |
Please contact Outdoor Structures Australia for additional information.
